Audit & Safety InspectionNFPA · NBC · IEEE · IS · ASHRAE

Find the Gaps.
Before They Find You.

S K SADIQ delivers independent MEPF audits and safety inspections across occupied and under-construction facilities. Code-referenced findings, prioritised remediation plans, and authority-ready reports.

Why Independent Audits Matter

Our independent auditors bring fresh eyes, current code knowledge, and zero conflict of interest — reviewing every MEPF system against the applicable standard, not just the original design intent.

Every audit produces a structured findings register with severity ratings, photographic evidence, code references, and a prioritised remediation roadmap. Reports are formatted for direct submission to Civil Defence, DEWA, or the relevant authority.

500+Facilities audited
98%Authority acceptance rate
48 hrsDraft report turnaround

Audit services

What We Inspect

MEPF Technical Audit

Comprehensive review of mechanical, electrical, plumbing, and fire protection installations against design drawings, specifications, and applicable codes. Covers installation quality, system performance, and documentation completeness.

As-built verificationCode compliancePerformance testing

Fire Safety Inspection

Full fire protection system audit covering detection, suppression, emergency lighting, signage, and evacuation routes. Referenced to NFPA 13, 72, 101, and local Civil Defence requirements.

NFPA 13 & 72Civil DefenceEvacuation routes

Electrical Safety Audit

Inspection of LV/MV distribution, earthing, bonding, switchgear, and protection coordination. Thermal imaging of panels and connections included as standard.

Thermal imagingLV/MV systemsIEC 60364

HVAC & Mechanical Audit

Assessment of HVAC system performance, ductwork integrity, refrigerant handling, and energy efficiency against ASHRAE 90.1 and local energy codes. Includes air balancing review.

ASHRAE 90.1Air balancingEnergy efficiency

Plumbing & Drainage Inspection

Inspection of domestic water, drainage, and sanitary systems for code compliance, backflow prevention, water quality, and legionella risk. Referenced to BS EN 806 and CIBSE TM13.

BS EN 806Legionella riskBackflow prevention

Pre-Handover & Snagging

Structured pre-handover inspection identifying incomplete works, defective installations, and missing documentation before practical completion is certified. Reduces post-handover defect liability.

Snagging registerDefect liabilityHandover readiness

Our process

From Brief to Report in 5 Steps

01

Scope Definition

We agree the audit scope, applicable codes, facility access requirements, and report format with your team before mobilisation.

02

Document Review

Existing drawings, O&M manuals, previous inspection records, and authority approvals are reviewed prior to site attendance.

03

Site Inspection

Qualified MEPF engineers conduct a systematic physical inspection, capturing photographic evidence and test readings against the agreed checklist.

04

Findings Register

All findings are logged with severity classification (Critical / Major / Minor), code reference, photographic evidence, and recommended remediation action.

05

Report & Remediation Plan

A formal audit report is issued within 48 hours of site completion, including an executive summary, full findings register, and prioritised remediation roadmap.

Standards & codes

We Audit Against the Right Standards

NFPA 13
Sprinkler system installation
NFPA 72
Fire alarm & detection
NFPA 101
Life safety code
ASHRAE 90.1
Energy efficiency in buildings
IEC 60364
Low voltage electrical installations
BS EN 806
Domestic water supply systems
BS 9999
Fire safety in buildings
ISO 45001
Occupational health & safety

Sectors served

Facilities We Audit

Commercial & Mixed-Use

Office towers, retail centres, hotels, and mixed-use developments

Healthcare

Hospitals, clinics, and medical facilities with critical system requirements

Industrial & Warehousing

Manufacturing plants, logistics hubs, and cold storage facilities

Residential

High-rise residential towers, villa compounds, and serviced apartments

Education

Universities, schools, and research facilities

Data Centres

Tier I–IV data centres with critical power and cooling infrastructure

Request an audit

Get Your Audit Scoped

Tell us about your facility and we'll respond with a scope outline and indicative timeline within one business day.

Scope outline within 1 business day
Qualified MEPF engineers on site
Draft report within 48 hrs of inspection
Authority-ready report format

All audit enquiries are treated as confidential. Findings are shared only with the commissioning party.